ATASANAYI IZBAN STATION

PROJECT DETAILS

CLIENT: İzmir Metropolitan Municipality
Project: İzmir Banliyö Sisteminin Geliştirilmesi Projesi 6.Etap İstasyonlar 4 Adet Ve Karayolu Üst.Geçidi İnş.
LOCATION: İzmir
CONSTRUCTION PERIOD: 2007 - 2008
ESTIMATED COST: 15.921.877,23 TL.
CONTRACT DATE: 27.04.2007
PROVISIONAL ACCEPTANCE DATE: 28.03.2008
FINAL ESTIMATED COST: 15.921.877,23 TL.
PRESENT VALUE: 28.054.584,24 TL.
Features: 2 x 210 mt line length, covered fully steel construction coving, 2 underpass, 2 overpass, 3.605 m² total construction area
İzmir Suburban System Stage Stations Constructions ProjectLocationYear Of Construction
Mavişehir İZBAN Stationİzmir2008
Bayraklı İZBAN Stationİzmir2008
Şemikler İZBAN Stationİzmir2008
Atasanayi İZBAN Stationİzmir2008